Pfister 016-HH2C Guía de instalación Pagina 3

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 2
ENGLISH
ENGLISH
7
8
9
11
10
7 SLIDE BAR INSTALLATION
Insert the bottom of Slide Bar (7A) through Wall Mount Opening (7B). Remove Dome Cap
(7C) from Slide Bar (7A) and retain Packing Clamp (7D) and Adjusting Ring (7E) in place.
From above, insert Dome Cap Slots (7F) to the top of Shower Arm (7G). From underneath
align Slide Bar (7A) to Dome Cap (7C) and thread Dome Nut (7H) by hand.
8 SHOWER DIVERTER INSTALLATION
Apply PTFE plumber's tape to all threaded ends of Shower Diverter (8A) according to
manufacturer's instructions. Screw Shower Diverter (8A) into the end of Shower Arm
(8B). Make sure Rubber Seal (8C) is retained inside Diverter Nut (8D).
9 HOSE INSTALLATION
Place Rubber Seal (9A) inside Hose Fitting (9B). Connect Hose (9C) into Shower
Diverter (9D) by turning Hex Hose Fitting (9B).
10 HAND SHOWER INSTALLATION
Place Rubber Seal (10A) inside Hose Fitting (10B). Connect Hand Shower (10C) to
Hose (10D) by turning Tapered Hose Fitting (10B) clockwise.
Make sure
Hand Shower (10C)
is securely tightened to Hose (10D).
11 SHOWER HEAD INSTALLATION
Thread Shower Head (11A) onto Shower Diverter (11B). Make sure Rubber Seal (11C)
is retained inside Shower Nut (11D).
Make sure
Shower Head (11A)
is securely tightened to
Shower Diverter (11B)
.
3
7A
8B
9B
10A
11A
7B
7A
7C
7D
7E
7G
7F
7H
8D
8A
8C
9A
9C
9D
10B
10C
10D
11B
11C
11D
Vista de pagina 2
1 2 3 4 5 6 7 8 ... 11 12

Comentarios a estos manuales

Sin comentarios